ClearMax Labs is an access control system installation company for Houston businesses: tenant floors in downtown and Galleria towers, tilt-wall warehouses, retail storefronts and medical office buildings. One written scope covers the reader at each door, the lock, the controller in your network closet, the cable that joins them and the way every locked door lets people out. ClearMax technicians install it on site, and your business keeps the administrator login and the records.
Last updated: November 2026
Which Houston code does a door job follow?
The city's, and it is not the plain model code. Houston has built to the 2021 Houston Construction Code since January 1, 2024. The city's own amendments, read together with the model codes, make up the Houston Construction Code. For door access that matters, because Houston rewrote the section on motion-released exits and added one for elevator lobbies.
Every opening gets a row first
Nothing is priced until each door has its own line: what it is for, who passes and when, what the door and frame are made of, and how people inside get out once the lock is electric. A small office usually lands on five or six:
- The tenant entry, off a corridor or an elevator lobby.
- A second exit to a stair or the back of the building.
- The network closet that will hold the controller.
- A stock, records or equipment room with a short list of names.
- A dock or roll-up door that takes deliveries at set times.
That list becomes the scope, the schedule your landlord reviews and the record you keep.
Which credential your staff carry
A building that already issues tenant badges often decides it: one reader can read the lobby card and your own credential, so staff carry one thing. Phone credentials suit companies that hire often: access is granted before a first day and withdrawn the afternoon someone leaves.
Placement follows reach, not habit. For a straight-on reach with nothing in the way, the ADA ceiling is 48 inches and the floor is 15. Readers and keypads go inside that band, and the drawing gives a height for each one.
Strike or maglock, door by door
An electric strike swaps into the frame and lets the latch pass on a good read. A maglock holds the door with a magnet on the header and lets go when its power drops, which suits glass storefronts where a strike will not fit.
A maglock on a way out needs more than a sensor. On a door released by its own hardware, working the lever or bar must interrupt the lock's power and unlock the door immediately. Where panic or fire exit hardware is required, operating it also has to release the electric lock. So the schedule pairs each maglock exit with switched lever or bar hardware wired into lock power. Door hardware a person operates belongs 34 to 48 inches above the finish floor.
Motion exits and Houston's larger button
Glass entries often open from the inside on motion. Houston amended how those doors must work:
- Houston's amended section allows sensor-released electric locks on exit-path doors in any occupancy except Group H.
- The motion sensor faces the inside, set to pick up a person walking up to leave.
- Houston sets a size floor the model code lacks: the manual unlocking button is a minimum of 1½ inches in diameter, mounted 40 to 48 inches up and within 5 feet of the secured doors. That button carries a sign reading PUSH TO EXIT.
- Pressing it has to interrupt power to the lock directly. After a press, the lock must remain unlocked for not less than 30 seconds.
- Where the building has a fire alarm system, its activation is required to unlock the lock, which stays unlocked until that system has been reset.
- The locking units on these doors have to be listed to UL 294.
The practical result: the button is ordered at the Houston size, not the small one in a catalog kit, and it sits in the lock's power path so the door releases even when the controller is offline.
Locked doors at an elevator lobby
High-rise tenant floors often want the lobby doors themselves locked. Houston wrote a section for that. Houston adds a section of its own for exit doors leaving elevator lobbies: they may be locked electrically from the egress side in buildings with sprinklers throughout or approved smoke or heat detection. On those lobby doors, a relay losing power or any wiring failure in the lock circuit has to unlock the door. Nobody may be made to pass through more than two such locked doors before entering an exit. The scope marks these as building engineer items and starts with the doors your lease controls.
When delayed egress comes up
Stockrooms sometimes ask for a door that holds briefly after a push. A delayed egress lock needs a building equipped throughout with an automatic sprinkler system or an approved automatic smoke or heat detection system. The first listed group of eligible occupancies is B, F, I, M, R, S and U. It is never offered as a standard choice; the scope raises it as a question for your architect and carries on with the other doors.
Controller, power and the cable path
The controller is a panel with a power supply and backup battery, mounted beside the network switch it reports to. Each door gets its own run back: reader, lock power, a door position contact and the exit device. Warehouse runs are long and high; tower runs share crowded risers. On a ground floor that has flooded before, the panel goes high.
Storm outages are part of planning here. A lock that releases when power is lost will release, so the scope states which doors free on an outage, how long the battery carries the rest, and who to call to re-secure the space.
More than one door, floor or address
A Westchase office and a warehouse near the Port can share one people list. Each site keeps its own controller in case the link drops, and one change removes a departing employee everywhere.
Cameras at the door, microphones off
A camera on a controlled door shows who actually walked through behind a badge. It records to a recorder at your space or a system you already run. Audio stays off: Texas Penal Code §16.02 makes it an offense to intentionally intercept a wire, oral or electronic communication. People talking near a door have not agreed to anything, so video only is the setting.
Visitor entry and care after handover
Intercom installation lets couriers and clients call in and releases the same lock. The door access service plan keeps names current and times every exit.
Questions Houston tenants raise early
Are we tied to one hardware brand?
No. Parts are named by type and job, and your business holds the login, so any later contractor can work on it.
What should the first message include?
The building and floor, a rough door list, head count, the date the space must open and two photos of each door. The project form has room for all of it.